Getting it Done February 2013

Posted By on January 31, 2013

I am a bit embarrassed……sort of…..I only met HALF my January Getting it Done Goals!  I had four things on my list and I accomplished TWO! But I did a little MORE than I meant to on two of them….so maybe I am not embarrassed at all…..LOL

First……I said I was going to put my Scrappy String Flying Geese blocks together with sashings…..       Did I do that……NO.  I actually am stuck….I can’t decide if this is going to be a quilt with sashings…..or a really cool border….so this is now on hold.

Scrappy String Geese

Scrappy String Geese

 

Second I wanted to get my blocks finished for my Bonnie Hunter Easy Street Mystery Quilt.   YEAH ME….I not only got my blocks completed, but I got them sewn together with borders put on.    SO YES FOR MY NUMBER 2 GOAL!

 

Easy Street with Borders

Easy Street with Borders

 

Third, I wanted to complete my blocks for my second Easy Street Mystery Quilt my Christmas Easy Street.  OK…..I did get my blocks completed….AND SEWN TOGETHER WITH BORDERS……  smile.  YES FOR MY NUMBER 3 GOAL!

 

Christmas Easy Street

Christmas Easy Street

 

And Fourth, I wanted to make a few blocks for the NEW YEAR’S EVE MYSTERY….but I didn’t even start!  The fabric strips are still on my design board.  Goal #4 is a BIG NO!

 

NYE 2012 Mystery Strips!

NYE 2012 Mystery Strips!

OK – so moving right along…..it is time to DECIDE what will go on my GETTING IT DONE February list!

I am going to keep putting FOUR GOALS on my list each month!

First…..I want to get the binding completed on my CURVED LOG CABIN QUILT.

Curved Log Cabin

Curved Log Cabin

 

Second, I want to get the binding on my Carolina Crossroads II Quilt (a Bonnie Hunter Quiltville Mystery Quilt.)

Carolina Crossroads 2

Carolina Crossroads 2

Third – I NEED to get my Christmas 2011 Mystery top put together……designed by Dorothy Young.

Christmas 2011 Mystery

Christmas 2011 Mystery

 

Fourth – I will spend some time on my Scrappy Grandmother’s Flower Garden!

Scrappy Grandmother's Flower Garden

Scrappy Grandmother’s Flower Garden

 Knowing me, putting TWO QUILT BINDINGS on my goal list for one month – A SHORT MONTH TOO – might be unrealistic….but hey, I am going to go for it!  🙂

 Check out what how other quilters did on their GETTING IT DONE January 2013 – and you will also get to see their GETTING IT DONE goals for February 2013.  Here is Judy Laquidara’s link.

 

http://www.patchworktimes.com/2013/01/31/get-it-done-february/

 

 

HAPPY SEWING EVERYONE!

About the author

Comments

5 Responses to “Getting it Done February 2013”

  1. Jill S. says:

    Both of your Easy Street quilts are beautiful! And that curved log cabin quilt is awesome! Good luck on your February goals 🙂

  2. Dar in MO says:

    I am impressed that you finished 2 Easy Street tops. I had as one of my goals to get my blocks all done, and I didn’t make that. Your curved log cabin is a great quilt. I’d like to do one of those too. I think you accomplished more than your goals for January!!! You get a gold star from me.

  3. WyoPat says:

    I like the way you put the blocks around your center block on your curved log cabin–different and effective!

  4. Susan says:

    It looks like a lot of progress to me! Good luck with those bindings.

  5. Catherine Etter says:

    WOW & WOW again, I think you did a stellar job!!!!! Keep up the great work baby, whata’ goal………

Leave a Reply